Project updates

MK Technindo Project Updates

Updates on ongoing work, from design and fabrication at our Sidoarjo workshop to installation at customer plants.

Project Updates

Latest Project Milestones

Projects we are currently working on

Chowel Project – PT INKA Site — MK TechnindoChowel Project – PT INKA Site — MK Technindo5 Oct 2026

Chowel Project – PT INKA Site

Spot Welding Robot Arm

Our work at PT INKA continues through May 2027. Current stage: preparing the PLN power installation in the work area.

Stage: Installation
5 Oct 2026MK TECHNINDOFabrication

PT Seger Agro Project

Belt Conveyor

Belt conveyor being assembled at our workshop in Sidoarjo.

Stage: Fabrication
PT Peroni Project — MK TechnindoPT Peroni Project — MK Technindo5 Oct 2026

PT Peroni Project

Troughing Conveyor

Shop drawing stage, before fabrication preparation.

Stage: Design
See completed projects →
Need references?

Request project examples from your industry

01.

Tell us your needs

Your product type, capacity, and line conditions.

02.

We send references

Photos and descriptions of similar projects we have completed.

03.

Workshop visit

See the fabrication process firsthand in Sidoarjo.

04.

Design & quotation

Technical drawings and a written quotation for your line.

Free consultation

Have a similar project? Talk to our team

From the first discussion to the machine running in your plant, one team handles it all. Start with a free consultation, with no obligation to order.

Chat on WhatsApp Send Email